Worked example

General loads become 10 kVA + 0.40 × 30 kVA = 22 kVA. The EVSE nameplate is 5.76 kVA, so the worksheet uses the conservative 7.2 kVA floor. Summing 22 + 6.8 + 7.2 gives 36 kVA.

The optional method includes its own demand steps. This worksheet presents the EVSE outside the 40% band as a conservative planning treatment. Confirm how the local authority wants EV charging documented in the optional calculation.

Calculation method

  1. Build the connected general load

    Use 3 VA per qualifying square foot, 1,500 VA per small-appliance or laundry circuit, and relevant nameplate values. Take the first 10,000 VA at full value and 40% of the rest.

  2. Compare HVAC operating cases

    Use the largest applicable 220.82(C) case. For a heat pump, use the compressor at 100% and the supplemental electric heat at 65%, with interlocked stages compared separately. Separately controlled electric heat uses 65% for one to three units or 40% for four or more.

  3. Add EVSE and divide by voltage

    This worksheet adds a conservative EVSE allowance outside the 40% band, using at least 7,200 VA per unit or its higher nameplate as a planning assumption. Confirm with the authority having jurisdiction how to include EVSE under the locally adopted optional method.

NEC 220.82 applies to a qualifying individual dwelling on a single 120/240 V or 208Y/120 V three-wire set with ampacity of 100 A or greater. Existing-dwelling and measured-load methods, approved load management, utility metering and service equipment ratings require separate review.

Common questions

Does the 40% dwelling demand factor apply to the EVSE here?

This worksheet adds the EVSE allowance after the general demand calculation. Use the approved local worksheet for a permit.

What happens to spare capacity in this exact 150 A example?

The calculated current equals the selected 150 A service rating. A higher new load would exceed the entered planning comparison.

References