Worked example

1.20 × 100 A = 120 A. At 16 A continuous the source contribution is 20 A, so the total reaches the 120 A ceiling. Enter a different main or bus rating to compare actual equipment.

Confirm available breaker positions, applicable label and load-side listing. An existing 100 A service may have separate load constraints if EV charging or electric heating is planned. Connecting an additional source requires the panel and utility checks for that installation.

Calculation method

  1. Read the busbar and main separately

    The panel label supplies the busbar rating. The protective device feeding the bus can be a different size. Multiply the bus rating by 1.20 to get the ceiling for this method.

  2. Choose the input basis

    The 2023 text uses 125% of the power-source output circuit current plus the main protective device. Using source breaker handles in place of their adjusted current values is a conservative screen when the devices cover the source load.

  3. Confirm the layout

    NEC 2023 places the opposite-end method in 705.12(B)(2), formerly 705.12(B)(3)(2) in 2020. The center-fed dwelling option is 705.12(B)(4) and uses one end of the bus.

Check the panel listing, Article 220 loads and the required label at the power source connection. Supply-side connections follow 705.11. An approved EMS or another 705.12 method needs its own documented design.

Common questions

What inverter AC nameplate is equivalent to 16 A at 240 V?

The voltage-current product is 3.84 kVA. Use the actual continuous AC output current for the code formula.

How does a 25 A PV breaker affect the 100 A breaker screen?

A 100 A main plus a 25 A source breaker totals 125 A in the simple screen, exceeding the 120 A ceiling.